● LIVE 7 RTOs/ISOs
v—

IQIP

Sign in to continue

Technology Mix (Active MW)
Status Distribution
Market Share by Active MW
Top Points of Interconnection
Loading projects
MW Forecast by Proposed COD Year (2024–2035)
Active projects only · excludes withdrawn and already-operating
Technology Mix by COD Year
Historical Operating Capacity (Actual COD)
Forecast Detail by Year
Avg Interconnection Cost per MW by Technology
Estimated cost in $k/MW · model-based estimate
Cost Distribution ($/MW)
Pipeline Investment by Market ($B)
Technology Investment Breakdown ($B total)
Top 10 Highest-Cost Projects

MISO DPP Study Cost Intelligence

Official per-project network upgrade costs extracted from MISO Definitive Planning Phase study reports. Phase 1 → 2 → 3 escalation tracks real cost evolution through the study process.

Avg Study Cost by Phase (DPP-2021)
Phase progression shows cost escalation per study cycle
Cost Distribution — MISO Study Estimates
Per-project total network upgrade cost ($M buckets)
Projects with MISO Study Costs
Sorted by total network upgrade cost · click a row to view project detail

Cost Escalation Heatmap

Phase-over-phase cost change per DPP cycle × study area. Exit-right thresholds: >50% (Ph1→Ph2) and >35% (Ph2→Ph3).

Loading…

Withdrawal Risk Signal

Projects ranked by predicted withdrawal risk based on relative cost position, absolute cost, and historical cycle escalation patterns.

Projects by Withdrawal Risk
Risk score 0–100 · factors shown on hover
Avg Years in Queue by Study Phase
Time since first seen in queue data
New Projects Entering Queue per Year
Withdrawal Rate by Entry Cohort (%)
Active Pipeline by Technology
Phase Dwell Times
COD Accuracy — Proposed vs Actual
Queue Age Distribution
Withdrawal Rate by Technology
Withdrawals by Queue Year
COD Delay Outlook Distribution
Withdrawal Risk Distribution
High-Risk Projects (Withdrawal Probability ≥ 70%)
Loading risk scores
Active MW by Market
Withdrawal Rate by Market (%)
Market Comparison Table
Download Project Data

Export filtered project data as CSV or Excel. XLSX exports include color-coded status, risk columns, and an export info sheet.

Ingestion Status
Loading
Manual Ingest Triggers
MISO Daily 06:00 CT
SPP Weekly Mon 07:00 CT
ERCOT Monthly 5th 08:00 CT
PJM Weekly Tue 07:30 ET
CAISO Daily 08:30 CT
NYISO Weekly Wed 07:00 ET
ISONE Weekly Wed 07:30 ET
ALL All 7 markets
Alert Configuration
Loading
Loading coverage info…
Total Queue Size (GW in Queue)
Active MW in interconnection queue at year-end
Annual MW Entering Queue by Technology
GW added each year — shows fossil→clean transition
Annual Withdrawal Rate
% of projects in each entry-year cohort that withdrew
Average Interconnection Cost ($/MW)
Median cost per MW by queue-entry year and technology
COD Achievement Rate
% of projects reaching commercial operation (on-time vs late)
ISO/RTO Market Growth Ranking
Annual GW queued per market (stacked) — last 10 years
Loading map…
Technology
Solar
Wind
Storage
Gas
Nuclear
Hydro
Other
County fill
Low MW
Medium
High MW

🎯 Evaluate a Candidate Site

🎯
Enter a location and technology above to get your site score

User Management

Users
Loading users

MISO DPP Study Reports

Catalog of DPP study report PDFs and their ingestion status

Loading study reports…
💡 Automated Discovery — To auto-discover new reports as MISO publishes them, open the MISO GI Studies page in Chrome DevTools → Network → XHR tab, reload, and look for the API endpoint that returns study documents. Then set MISO_GI_STUDIES_API_URL in your environment and run python -m iqip.cli study-costs refresh.